ASIAN HERCULES II

1600 MT PROPULSION-ASSISTED
SHEERLED CRANE VESSEL


SPECIFICATIONS :

 

Specifications

Mooring System

 

·

Anchor : 8 nos. of high holding power anchors/type AC14-7015 kg each.

·

Length o.a. : 91.00 metres

·

Anchor wire length : 8 lengths each 1000m

·

Breadth moulded : 43.00 metres

·

Number of mooring points : 8 points anchor mooring system

·

Depth moulded : 8.50 metres

Winches

·

Max/Min draft : 5.00 /2.40 metres

·

Luffing : 2 units luffing winches providing maximum luffing speed of 0.833 m/min at full speed

·

Gross tonnage : 10560 tons

·

Main hoist : 4 units main hoisting winches each capable of achieving hoisting speeds 2m/min at full load of 800 m tons and 4m/min at light / no load

·

Net tonnage : 3168 tons

·

60 mtons aux hoist : 2 units auxiliary hoisting winches each capable of achieving hoisting speeds 5m/min at full load of 60mtons and 10m/min at light/no load

·

Displacement : 16500 tons (even keel)

·

38 m tons aux hoist : 2 units auxiliary hoisting winches each capable of achieving hoisting speeds 5m/min at full load 38 mtons and 10m /min at light /no load

·

Speed : 7 knots

·

Cargo handling : 4 units cargo winches each capable of pulling 20mtons at10m/min

·

The vessel is equipped with an 8-point abchoring system ant the anchors as per class requirement.

·

Anchor mooring : 8 units anchor winches each capable of pulling 30mtons at 10m/min

·

The deck in the working area is suitable for a deckload of 15t/m ²

·

Class Anchor : 1 unit class anchor winches for handling the 515kg AC1 bow anchor via 66 mm grade anchor chain

·

The crane vessel is equipped with a workboat of about 12m length with a 150HP propulsion.

 
  For ocean transport the A Frame can be lowered on to a boomrest.  
  A-Frame Working Position
For creating more deck space for cargo on the main deck, the A-frame of the sheerleg can be skidded along fixed tracks on deck into three different working positions :
 
  Position 1 : Located at 5200 mm from forward of vessel  
  Position 2 : Located at 33000 mm forward of vessel  
  Position 3 : Located at 59000 mm from forward of vessel  
  With the A-frame in position 3 load can be handled on vessel over deck. The seatransport condition is also with A-frame in position 3.  

Click Here To View Load Chart